Monday 18 March 2024

EICR DOMESTIC TESTING Eicr - Electrical Inspection Condition report from £129.00 plus vat

 EICR DOMESTIC TESTING

Eicr - Electrical Inspection Condition report from £129.00 plus vat

CROYDON PAT TESTING 

CROYDON PAT TESTING 

Your Health and Safety Service Provider

Tel.     : 0800 001 6799

Mob.   : 07886431799

info@croydonpattesting.com


https://croydonpattesting.co.uk/eicr-domestic-testing


ASBESTOS SURVEYS IN CROYDON, SURREY, LONDON, KENT AND WEST SUSSEX FROM £220

ASBESTOS SURVEYS IN CROYDON, SURREY, LONDON, KENT AND WEST SUSSEX FROM £220

CROYDON PAT TESTING 

Your Health and Safety Service Provider

Tel.     : 0800 001 6799

Mob.   : 07886431799

info@croydonpattesting.com

https://croydonpattesting.co.uk/asbestos-surveys

FIRE RISK ASSESSMENT SERVICE

 FIRE RISK ASSESSMENT SERVICE

Fire risk assessments Deal 1
£99.00 plus vat
Ideal for Communal hallways – Small studios apartments.
Fire risk assessments Deal 2
£139.00 plus vat
Ideal for Large blocks of apartments assessing the Communal hallways and exits or HMO properties with 5 or 6 studios in the building.
Fire risk assessments Deal 3
£179.00 plus vat
Ideal for Package is Large GP surgery - Café - Restaurants - Offices - Workshops - Beauty salons - Churches.
Fire risk assessments Deal 4
£POA plus vat
Tailored for Extra Large businesses or Organizations.
Ideal for Package is for XL Large Retails shops - Warehouses - Restaurants - Large Offices - Garages - Public houses - Factories - Workshops - Beauty salons - Churches etc.

CROYDON PAT TESTING 

Your Health and Safety Service Provider

Tel.     : 0800 001 6799

Mob.   : 07886431799

info@croydonpattesting.com


https://croydonpattesting.co.uk/fire-risk-assessments

LONDON FIRE EMERGENCY EVACUATION PLAN ALSO KNOWN AS FEEP

LONDON FIRE EMERGENCY EVACUATION PLAN ALSO KNOWN AS FEEP

Service Description

A London fire emergency evacuation plan also known as (FEEP) is a written document which includes the action to be taken by all staff in the event of fire and the arrangements for calling the fire brigade. 

General Fire Notice For small business properties, this could take the form of a simple fire action sign posted in positions in your communal areas where staff and relevant persons can read it and become familiar with its contents. 

Staff Fire Notice High fire risks or large properties will need more detailed emergency evacuation plan which takes account of the findings of the Fire risk assessment, where the staff could be at significantly higher risk in their location. In addition, notices giving clear instructions of the routine to be followed in case of fire. 

Our prices start from £169.00 plus vat this is for a medium size office or shop workshop or similar with approx 10 staff, for properties with more staff or large properties please email us for a quote.

What happens after placing my order, you will get an email confirming your order with the date and approximate time for one of our surveyors to attend at you Property or site location.

Our surveyor will then carry out the inspection and record their findings. After the assessment is complete the surveyor will send the information back to the office, where the report will be ready to email you in a PDF format.

The certificate of compliance for you to produce and keep for your records. 

The time to complete varies on each business home are approximately from 60 to 180 mins. The reports are emailed to you within 24hrs of appointments date. Note our surveyor will contact you in the event of them running behind time on their daily visits for testing. 

We always endeavor to get to you on time. 

The recommended retest date will be on the certification provided and we will send a reminder 1 month before it is due to expire, to give you time if you wanted to re book back in before expiry. 

You have two options to pay for this service, pay online via the website eCommerce up front or we can invoice after testing.

But note certification will not be released until payment is made. Unless you are an account customer, or it has been pre agreed before. 

Easy booking with a team of experienced staff & Qualified engineers, we strive to provide the best service at the best prices. If you have any further questions, please email us at info@croydonpattesting.com


If you would like to see an example of our evacuation plans.


Email  us and we will show you some examples of what we can do for your business.


Prices start from £169.00 plus vat 


Fire evacuation plan - information 

  • Fire evacuation strategy
  • Action on discovering a fire
  • Action on hearing the fire alarm
  • Calling the fire brigade
  • Power/process isolation
  • Identification of key escape routes
  • Fire wardens/marshals
  • Places of assembly and roll call
  • Firefighting equipment provided
  • Training required
  • Personal Emergence Evacuation Plan
  • Liaison with emergency services

London Fire evacuation strategy


You need to consider how you will arrange the evacuation of the premises if there was a fire your risk assessment and the other fire precautions you have put in place.

Simultaneous Evacuation In most premises, the evacuation if there was a fire will simply be by means of everyone reacting to the warning signal given when a fire is discovered, then making their way, by the means of escape as plans and shown to get people out of the building to a place of safety.
This is known as a simultaneous evacuation and will normally be initiated by the sounding of the alarm over the fire warning system. Vertical Phased Evacuation.

In some larger complex or high rise properties, the emergency arrangements are designed to allow people who are not at immediate risk from a fire to delay starting their evacuation.

It may be appropriate to start the evacuation by initially evacuating only the area closest to the fire and warning other people to stand by. This is normally done by immediately evacuating the floor where the fire is located and the floor above. The other floors are then evacuated one by one to avoid congestion on the escape routes. The rest of the people are then evacuated if it is necessary to do so. The fire warning system should be able to give two distinctly different signals (warning and evacuation) or give appropriate voice messages.

Horizontal phased evacuation in hospitals and care homes: the floor maybe divided into a number of fire resisting compartments and the occupants are moved from the compartment involved in fire to the adjacent compartment and if required to move again. Depending onto the fire situation it may eventually be necessary to consider vertical evacuation. Because of the extra time this type of evacuation takes, other fire precautions
maybe be required as below.


  • Voice alarm systems
  • Fire control points
  • Compartmentation of the premises using fire-resisting construction
  • Sprinklers in buildings where the top floor is 30 meters or more above ground level

Staff Alarm Evacuation (Silent Alarm)


In some instances it may not be appropriate for a general alarm to start immediate evacuation of London Cinemas.

This could be because of the number of people present and the need for the staff to put per-arranged plans in place first for the safe evacuation of the premises into action.

In such circumstances a staff alarm can be given by fire records, personal pagers, discreet sounders, or a coded phrase on a public address system etc. Following the staff alarm, a more general alarm signal can be given, and a simultaneous or phased evacuation started. The general alarm may be activated automatically if manual initiation has not taken place within a pre-determined time.


Defend in Place


This strategy may be considered in London blocks of flats where each flat is a minimum 60 minute fire resisting compartment. It may also be considered in hospitals or nursing homes where patients are connected to life supporting equipment and cannot be moved.

The concept allows the occupants to stay put and allow the fire service to extinguish the fire. If the fire spreads and it cannot be controlled, then they will initiate a full evacuation. In the case of patients connected to life supporting equipment a decision has to be made which option is the best, stay or move, either way the patient would be at serious risk.

You should only plan to use defend-in-place, phased evacuation schemes or a staff alarm system if you have sought the advice of a competent person and the fire and rescue service.
 

Action on hearing the fire alarm


​On discovering a fire, it is the duty of every person to sound the nearest fire alarm immediately. The plan should include the method of raising the alarm in the case of fire. The plan should instruct all personnel upon hearing the fire alarm to act in accordance with the agreed FEEP strategy and if a fire warden’s scheme is in force, they, on hearing the alarm, should proceed to pre-determined positions to assist members of the public and staff to leave the building by the nearest safe route. Lifts and escalators should not be used due to possible electrical failure unless they are part of a Personal Emergency Evacuation Plan. Personnel should not re-enter the building except for the Fire Team.


Calling the fire brigade


The Fire Service should also be informed immediately, either by switchboard operator or person discovering fire, dependent on conditions:


  • Work Time – Switchboard operator to be familiar with the emergency evacuation plan, also should ensure necessary extensions switched through when switchboard is unattended.
  • Other Times – Remainder of Staff (Cleaners, caretakers etc) also to be familiar with procedure. In any case the most senior official should ensure that Fire Service ha been called.


Power/process isolation


Close Down Procedure – Adopt your own ‘Close Down’ procedure as appropriate
Identification of key escape routes In premises where members of the public or persons unfamiliar with layout of the premises are present there should be means available to identify the key escape routes. They could include schematic drawings and most importantly emergency escape also exit signs.


Fire evacuation plans, are an essential for all work places.


Prices start from only £169.00 plus vat 


CROYDON PAT TESTING 

Your Health and Safety Service Provider

Tel.     : 0800 001 6799

Mob.   : 07886431799

info@croydonpattesting.com

https://croydonpattesting.co.uk/evacuation-plans









FIRE EXTINGUISHER INSPECTIONS IN CROYDON,SURREY AND LONDON

FIRE EXTINGUISHER INSPECTIONS IN CROYDON,SURREY AND LONDON

FROM ONLY £59 PLUS VAT


CROYDON PAT TESTING 

Your Health and Safety Service Provider

Tel.     : 0800 001 6799

Mob.   : 07886431799

info@croydonpattesting.com

www.croydonpattesting.co.uk

FIRE ALARM TESTING FOR LANDLORDS AND ALL BUSINESS SECTORS

 FIRE ALARM TESTING FOR LANDLORDS AND ALL BUSINESS SECTORS

Prices
Basic battery alarms & heat detector £69.99 + VAT
Mains wired alarm and interlinked heat detector £89.99 + VAT
Up to eight zone alarm systems £129.99 + VAT
Fault find or fix service £150 for the first hour
Standard Delivery within 24-48 hours after site visit Free
Express Delivery within 2- 4 hours after site visit £30.00

Monday 12 February 2024

FIRE RISK ASSESSMENT SERVICE IN CROYDON SURREY AND LONDON

 FIRE RISK ASSESSMENT SERVICE IN CROYDON SURREY AND LONDON

Fire risk assessments Deal - Information.
What happens after placing my FRA order.
You will get an email confirming your Fire risk assessment order with the date and approximate time for one of our engineers to attend at you Property or your requested site location. Our London fire surveyor will then carry out the fire risk assessment taking notes of everything in the specified area being assessed, and what safety measures are there and what is not there. From alarms fire extinguishers Em lights etc and then seeing if you have any policies or fire procedures in place. This Includes the fire risk logbook exits and more, collecting all the information we require. After the London survey is complete the surveyor will send the information back to the office, where the fire risk assessment report will be ready to email you in a PDF format. The report is normally a 8-page document with characteristics of your property, the results of the survey and possible recommendations depending on what you have there in your property. This is your copy to keep for your records or to assist you if recommendations are noted on the report, note this is a live document and can be up dated and changed as recommendation arise or things change in the law. The time to complete fire risk assessment can vary depending on the property and environment and the system you have in the property. The reports are emailed to you within 24hrs of completed job. Note our surveyor will contact you in the event of them running behind time on their daily visits for testing. We endeavor to get to you on time.
The recommended retest date will be on the fire risk assessment provided and we will send a reminder 1 month before it is due to expire, to give you time if you wanted to re book back in before expiry. You have two ways to pay either up front online via the website or you will be invoiced on completion of testing but note, certification will not be released until payment is made. Unless you are an existing account customer, or this has been pre agreed.
Easy booking with a team of experienced staff & Qualified fire surveyor engineers, we strive to provide the best service at the best prices.
CROYDON PAT TESTING
Tel: 0800 001 6799
Tel: 01737 200046
Mob: 07886431799

EICR DOMESTIC TESTING Eicr - Electrical Inspection Condition report from £129.00 plus vat

  EICR DOMESTIC TESTING Eicr - Electrical Inspection Condition report from £129.00 plus vat CROYDON PAT TESTING  CROYDON PAT TESTING  Your...